
Truax Engineering Multimedia Archive: Images |
|
X-3
Firings
Redwood City Harbor, CA Test
Facility
(aka "The Barge") |
 |

| Alan
Poole posing with his handywork |
|
 |
 |
 |
 |

| John
Houck and me at the helm in the control
room |
|

| Ken
Mason surveying the damage after the LOX
tank failed during a cold flow test in
preparation for X-3 Firing #5 |
|

| Me
not happy with the new vehicle
configuration |
|
TEI
Surplus Thor Missiles
Carlsbad, CA Engineering
Facility |
 |
 |
 |
| TEI
Personnel |

Bob Truax |

Circa 1991 |
|
|
Early
TEI Photographs
Courtesy of Brian Lue and
Dezso Molnar |

| Dezso
and X-1 fabrication circa 1984 |
|

| X-3
assembled to win NRL contract |
|
 |

X-3 drop test in
Monterey |
| More
coming soon! |
|
| |
|
|
|
| neverworld.net
/ truax
/ images |
|
© Copyright 2006-2007
Thomas G. Duffey. All rights reserved.
tom@neverworld.net |